Sunday, December 30, 2012

Our new home’s floor plans

 

So, I know I have not really announced this. Not because I have been trying to be secretive, but because this is a long process, full of ups and downs, certainty, then uncertainty, then everything changes. So, without further ado; Dennis and I are building a home! Yay!!!

Townside Construction is building our family a ranch style home with a basement (unfinished until we do it) due to be finished in 6-8 months. Jerry says 6, but I think it’s wise we just settle in for the 8 month goal so that we don’t grow impatient waiting. The home will be built on the corner of Buffalo St. and Blackhawk St. in the Cherokee Hills neighborhood. I am happy about this location for a number of reasons:

1. a LOT of our dear friends live in this neighborhood.

2. It’s in a great, grown up neighborhood great for walking and our particular street is a double cul-de-sac so that Daniel will be pretty safe playing.

3. It has a great school system, should, for some CRAZY reason, Daniel HAS TO go to public school.

4. It’s on a great side of town.

It’s been the neighborhood we have kept our eyes peeled on for the past year, if not the past three!

This blue print is not 100% accurate: the kitchen and dining room are reversed. I had a small issue with walking into the house from the garage into the “dining room;” I’d rather walk in to the kitchen itself.

IMG_0103

So, the front door is the indention in the middle between the garage and front of the house.

IMG_0104

IMG_0105

The last two pictures are close ups of the house, sorry the last picture is a little blurry! :/

In a nutshell:

-3 bedrooms

-2 full bathrooms

-a living room/kitchen/dining area great room with vaulted ceilings

-unfinished basement

The plans for the unfinished basement include:

-a great and awesome office for me to run my business out of with a place for my sewing materials and crafting stuff. It’ll be called the room of magic! Smile I do create lots of magic in my office. hahah.

-a large homeschool room complete with bookshelves, tables, and everything needed to school our child(ren)

- a large 4th bedroom with a bathroom for guests. (or a third child, but that’s like, probably never going to happen at our rate, the real intention is for his parents mainly.)

- Another large living room

- a third bathroom

The time frame on finishing this basement is probably a good 5 years, doing it in spurts. In the mean time for my office, Jerry has built me a little place for my computer, etc in a section of the kitchen that will be hidden. It’s not perfect, but it will do until we can make a comfy place for me downstairs.

Thanks for reading about all of our great plans! Smile I can’t wait to take pictures of the ground being broken in a few short weeks!

Happy New year everyone!!!

1 comment:

BollingWith5 said...

So exciting. Will you now be a potential hoster for small group.

Total Pageviews